| | | | Photo Gallery
| Admiring the rope bridge and slide at the Ranch
|
Pipework!
|
Chris cuts the pipe to the right length
|
Eeek, watch what you're doing please!
|
Cut end of pipe
|
First pipe in place
|
The rope is needed to get one end of the pipe across the water
|
Construction of steps begins with two diagonal side pieces. Each step will have supports on both sides.
|
It was a bit of a damp and muddy day!
|
Work on the second set of steps
|
Re-using old materials doesn't always make for the straightest of lines. We call it rustic.
|
Almost finished, just need one set of steps, some boards to stand on and a handrail
|
|
|